Switch - RNO 5
近期公告
  • 11th 二月 2026, RNO 4 & 5 Lighting Strik

    Shelter in place is in effect for lightning nearby. Teams will need to shelter inside for 30 minutes past last lightning strike.

  • 11th 二月 2026, Site lunch

    Hey team,

    Gray will have lunch on site for everyone @11. See you all there

  • 08th 二月 2026, Building Clean Up Campus Wide

    Teams, Starting Monday morning, all trades will be required to perform composite clean up in your laydown and work areas. All PTP's and Permits will not be signed until Gray Site and Safety has walked all areas and signed off each room/area for each trade. Teams working on the exterior and generator pads will be required to remove all trash and access material. All trash from the interior will need to be brought out and thrown into the green dumpsters.

现场天气预报
当前现场天气

不可用


观测信息来自 - 不可用
时区 - 北美东部标准时间
预测 - 星期三、11 二月

不可用


时区 - 北美东部标准时间
明天 - 星期四, 12 二月

不可用


重要现场文件
刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册

刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

刚到这个现场吗?

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册

;