Switch - RNO 5 - Offentlig projektarbejdsplads
-
29th september 2026, RNO 05 Cloud 4 Hydro test 9/30/26 UPDATED
Contractor: ACCO Mechanical
Location: Cloud 4 including fan galleries
System: HAC Manifold, SFN
Test Pressure: 150 PSI Hydro
Exclusion Zone: 1 foot
Date: Hydro 9/30/26
Time: Monday 6:00am to 2:00pm
Test Details
All,
ACCO will be performing a hydro in the north & south loop of the SFN piping; all access to the areas will be limited until the hydro test is completed.
Please observe all posted barriers & contact Giovanni Pirrodi (775-432-9183) if you need to enter the exclusion zone
Safety & Coordination:
For the safety of all personnel and to minimize disruptions, please ensure that all trades coordinate with onsite teams to relocate work activities away from the designated testing area during the specified time.
Thank you for your cooperation. -
29th september 2026, RNO5 J-Line Shutdown COSCO Pipe Install 9/30/26
All,
Vedhæftede filer :
Cosco will continue installing 2-inch pipe along J-Line
As work progresses from west to east, small sections of the J-Line corridor will be temporarily closed. Please plan accordingly and use alternate routes when necessary.
For everyone's safety, please:
-Observe all barricades, signage, and designated pedestrian walkways.
-Do not enter restricted work areas unless authorized.
-Maintain situational awareness when moving through or around the work zone.
Cosco J-Line Work access .png
-
04th september 2026, SITE WEATHER NOTIFICATION – HIGH WINDS
SITE WEATHER NOTIFICATION – HIGH WINDS
Current Wind: 27 MPH
Wind speeds have exceeded the site’s 23 MPH threshold.
Cranes & material platforms: Shut down.
MEWPs/outdoor work: Evaluate with Gray Safety.
Roof work/access: Stop work.
Secure loose materials and equipment.
Continue monitoring wind conditions and follow Gray Safety direction.
Aktuelt vejr på stedet
Utilgængelig
Tidszone - Eastern-normaltid
Prognose - lørdag, 10 oktober
Utilgængelig
Imorgen - søndag, 11 oktober
Utilgængelig
Kender du kravene for personlige værnemidler til dette sted?
Sørg for, at du har det korrekte sikkerhedsudstyr til din første dag på arbejdspladsen.
Kom hurtigere i gang med arbejdet, når du ankommer til stedet.
Afslut din webstedsregistrering online, når det passer dig, og spar tid.
Kender du kravene for personlige værnemidler til dette sted?
Sørg for, at du har det korrekte sikkerhedsudstyr til din første dag på arbejdspladsen.
Kom hurtigere i gang med arbejdet, når du ankommer til stedet.
Afslut din webstedsregistrering online, når det passer dig, og spar tid.