Switch - RNO 5 - Public Project Site
-
05th May 2026, RNO4 Building in TEST MODE
RNO4 Building is in TEST MODE, please be cautious with debris, dust, or smoke that can potentially activate the FIRE ALARM SYSTEM.
-
04th May 2026, RNO 05 ACCO REFER Pneumatic Test DECOM Room 1161 (5/5/26 - 5/6/26)
ACCO REFER
Attachments :
Location: DECOM Room 1161
System: VCU 49 & HPAH-2
Test Pressure: Pneumatic 600
Exclusion Zone: 19 Feet (VCU 49), 11 feet (HPAH-2)
Date: 5/5/26 – 5/6/26
Time: 7:00 AM – 7:00 AM (24 Hours) UPDATED TIME
Test Details
ACCO refrigeration will be performing a Pneumatic test on VCU system 49 & HPAH-2 in DECOM room 1161 on 5/5/26 until 5/6/26 (24-hour test, 10:00AM – 10:00AM). The test pressure will be 600 PSI with an exclusion zone of 19 feet for VCU 49 & 11 feet for HPAH-2.
Safety & Coordination:
For the safety of all personnel and to minimize disruptions, please ensure that all trades coordinate with onsite teams to relocate work activities for the duration of the test.
Thank you for your cooperation.
HPAH-2 (1).xlsx
VCU 49 (1).xlsx
VCU 49 exclusion zone (1).pdf
HPAH-2 exclusion zone (1).pdf
-
03rd May 2026, Team, RNO4 Building is in TEST MODE please be cautious with debris, dust or smoke that can potentially activate the FIRE ALARM. Time: 6:30am to 2pm.
Team,
RNO4 Building is in TEST MODE please be cautious with debris, dust or smoke that can potentially activate the FIRE ALARM. Time: 6:30am to 2pm.
Current Site Weather
Unavailable
Time Zone - Eastern Standard Time
Forecast - Saturday, 9 May
Unavailable
Tomorrow - Sunday, 10 May
Unavailable
Do you know the PPE Requirements for this site?
Ensure you have the correct safety equipment for your first day at the site.
Get started working sooner when you arrive on site.
Enroll online at your convenience and save yourself time.
Do you know the PPE Requirements for this site?
Ensure you have the correct safety equipment for your first day at the site.
Get started working sooner when you arrive on site.
Enroll online at your convenience and save yourself time.