Switch - RNO 5
Boletines recientes
  • 10th agosto 2026, CRANE DISASSEMBLY SAFETY NOTICE

    CRANE DISASSEMBLY SAFETY NOTICE – TODAY, 8/10/2026 AT 7:00 AM. Crane disassembly operations will begin at 7:00 AM today. All personnel must stay clear of the designated exclusion zone and follow the direction of the crane crew, riggers, and signal person. Only authorized personnel are permitted within the controlled area.

    Adjuntos :
    Screenshot 2026-08-10 052323.png
    Screenshot 2026-08-10 052459.png
  • 07th agosto 2026, 📢 SAFETY NOTICE – BREAK TENT & FOOD POLICY

    Effective Today at 11:00 AM

    The South East Break Tent and North East Break Tent will be open and available for use starting at 11:00 AM today.

    Reminder to All Personnel:
    ✅ All meals, snacks, and beverages (other than water) must be consumed in the designated break tents only.
    ✅ Water is the only beverage permitted inside the building.
    ❌ No eating is permitted inside the building.
    ❌ No beverages other than water are allowed inside the building.

    Effective immediately at 11:00 AM today, anyone observed eating or consuming beverages other than water inside the building will be subject to immediate corrective action in accordance with site safety policies.

  • 06th agosto 2026, RNO 05 Cosco Fire Hydro test Power Rooms 200s' (8/7/26) UPDATED BULLETIN

    COSCO FIRE

    Location: Power Rooms 200s' (3 Power Rooms)

    System: Fire suppression system

    Test Pressure: Hydro 225

    Exclusion Zone: 1 foot

    Date: 8/7/26

    Time: 1:00 PM – 4:00 PM

    Test Details:
    COSCO Fire will be performing a hydro test on the fire suppression system in power rooms 200 on 8/7/26 starting at 1:00 PM until 4:00PM. The test pressure for this activity will be 225 PSI with an exclusion zone of 1 foot. Access & work will be allowed in the effected power rooms except for overhead work. Overhead work will not be permitted during the testing times listed above.

    Safety & Coordination:
    For the safety of all personnel and to minimize disruptions, please ensure that all trades coordinate with onsite teams to relocate work activities for the duration of the test.
    Thank you for your cooperation.

    Adjuntos :
    Exclusion Zone Calculator (1) (2) (1) (1).xlsx
    Screenshot 2026-08-05 061150 (1).png
    PR 1 Pneumatic test cert (1) (1).pdf
Pronóstico del tiempo del emplazamiento
Tiempo actual del emplazamiento

No disponible


Observación procedente de - No disponible
Huso horario - hora estándar oriental
Pronóstico - lunes, 10 agosto

No disponible


Huso horario - hora estándar oriental
Mañana - martes, 11 agosto

No disponible


Documentos importantes del emplazamiento
¿Es nuevo en el emplazamiento?

¿Conoce los requisitos de EPI para este emplazamiento?

Asegúrese de que cuenta con el equipo de seguridad correcto para su primer día en el emplazamiento.

Visualización de los requisitos del EPI de la obra

Empiece a trabajar antes al llegar "in situ".

Complete su registro en el sitio web en línea a su conveniencia y ahorre tiempo.

Iniciar el registro

¿Es nuevo en el emplazamiento?

¿Conoce los requisitos de EPI para este emplazamiento?

Asegúrese de que cuenta con el equipo de seguridad correcto para su primer día en el emplazamiento.

Visualización de los requisitos del EPI de la obra

¿Es nuevo en el emplazamiento?

Empiece a trabajar antes al llegar "in situ".

Complete su registro en el sitio web en línea a su conveniencia y ahorre tiempo.

Iniciar el registro