Switch - RNO 5
Recente Bulletins
  • 10th augustus 2026, CRANE DISASSEMBLY SAFETY NOTICE

    CRANE DISASSEMBLY SAFETY NOTICE – TODAY, 8/10/2026 AT 7:00 AM. Crane disassembly operations will begin at 7:00 AM today. All personnel must stay clear of the designated exclusion zone and follow the direction of the crane crew, riggers, and signal person. Only authorized personnel are permitted within the controlled area.

    Bijlagen :
    Screenshot 2026-08-10 052323.png
    Screenshot 2026-08-10 052459.png
  • 07th augustus 2026, 📢 SAFETY NOTICE – BREAK TENT & FOOD POLICY

    Effective Today at 11:00 AM

    The South East Break Tent and North East Break Tent will be open and available for use starting at 11:00 AM today.

    Reminder to All Personnel:
    ✅ All meals, snacks, and beverages (other than water) must be consumed in the designated break tents only.
    ✅ Water is the only beverage permitted inside the building.
    ❌ No eating is permitted inside the building.
    ❌ No beverages other than water are allowed inside the building.

    Effective immediately at 11:00 AM today, anyone observed eating or consuming beverages other than water inside the building will be subject to immediate corrective action in accordance with site safety policies.

  • 06th augustus 2026, RNO 05 Cosco Fire Hydro test Power Rooms 200s' (8/7/26) UPDATED BULLETIN

    COSCO FIRE

    Location: Power Rooms 200s' (3 Power Rooms)

    System: Fire suppression system

    Test Pressure: Hydro 225

    Exclusion Zone: 1 foot

    Date: 8/7/26

    Time: 1:00 PM – 4:00 PM

    Test Details:
    COSCO Fire will be performing a hydro test on the fire suppression system in power rooms 200 on 8/7/26 starting at 1:00 PM until 4:00PM. The test pressure for this activity will be 225 PSI with an exclusion zone of 1 foot. Access & work will be allowed in the effected power rooms except for overhead work. Overhead work will not be permitted during the testing times listed above.

    Safety & Coordination:
    For the safety of all personnel and to minimize disruptions, please ensure that all trades coordinate with onsite teams to relocate work activities for the duration of the test.
    Thank you for your cooperation.

    Bijlagen :
    Exclusion Zone Calculator (1) (2) (1) (1).xlsx
    Screenshot 2026-08-05 061150 (1).png
    PR 1 Pneumatic test cert (1) (1).pdf
Locatie Weersvoorspelling
Huidige weersomstandigheden op locatie

Niet beschikbaar


Waarneming afkomstig van - Niet beschikbaar
Tijdzone - Eastern-standaardtijd
Weerbericht - maandag, 10 augustus

Niet beschikbaar


Tijdzone - Eastern-standaardtijd
Morgen - dinsdag, 11 augustus

Niet beschikbaar


Belangrijke locatiedocumenten
Nieuw op locatie?

Weet u wat de PBM-vereisten voor deze locatie zijn?

Zorg dat u voor uw eerste dag op de locatie de juiste veiligheidsapparatuur hebt.

Locatie PBM-eisen Weergeven

Begin sneller te werken zodra u op de locatie aankomt.

Voltooi uw locatieregistratie eenvoudig online en bespaar zo kostbare tijd.

Registratie beginnen

Nieuw op locatie?

Weet u wat de PBM-vereisten voor deze locatie zijn?

Zorg dat u voor uw eerste dag op de locatie de juiste veiligheidsapparatuur hebt.

Locatie PBM-eisen Weergeven

Nieuw op locatie?

Begin sneller te werken zodra u op de locatie aankomt.

Voltooi uw locatieregistratie eenvoudig online en bespaar zo kostbare tijd.

Registratie beginnen