Switch - RNO 5
Nedávné bulletiny
  • 10th srpna 2026, CRANE DISASSEMBLY SAFETY NOTICE

    CRANE DISASSEMBLY SAFETY NOTICE – TODAY, 8/10/2026 AT 7:00 AM. Crane disassembly operations will begin at 7:00 AM today. All personnel must stay clear of the designated exclusion zone and follow the direction of the crane crew, riggers, and signal person. Only authorized personnel are permitted within the controlled area.

    Přílohy :
    Screenshot 2026-08-10 052323.png
    Screenshot 2026-08-10 052459.png
  • 07th srpna 2026, 📢 SAFETY NOTICE – BREAK TENT & FOOD POLICY

    Effective Today at 11:00 AM

    The South East Break Tent and North East Break Tent will be open and available for use starting at 11:00 AM today.

    Reminder to All Personnel:
    ✅ All meals, snacks, and beverages (other than water) must be consumed in the designated break tents only.
    ✅ Water is the only beverage permitted inside the building.
    ❌ No eating is permitted inside the building.
    ❌ No beverages other than water are allowed inside the building.

    Effective immediately at 11:00 AM today, anyone observed eating or consuming beverages other than water inside the building will be subject to immediate corrective action in accordance with site safety policies.

  • 06th srpna 2026, RNO 05 Cosco Fire Hydro test Power Rooms 200s' (8/7/26) UPDATED BULLETIN

    COSCO FIRE

    Location: Power Rooms 200s' (3 Power Rooms)

    System: Fire suppression system

    Test Pressure: Hydro 225

    Exclusion Zone: 1 foot

    Date: 8/7/26

    Time: 1:00 PM – 4:00 PM

    Test Details:
    COSCO Fire will be performing a hydro test on the fire suppression system in power rooms 200 on 8/7/26 starting at 1:00 PM until 4:00PM. The test pressure for this activity will be 225 PSI with an exclusion zone of 1 foot. Access & work will be allowed in the effected power rooms except for overhead work. Overhead work will not be permitted during the testing times listed above.

    Safety & Coordination:
    For the safety of all personnel and to minimize disruptions, please ensure that all trades coordinate with onsite teams to relocate work activities for the duration of the test.
    Thank you for your cooperation.

    Přílohy :
    Exclusion Zone Calculator (1) (2) (1) (1).xlsx
    Screenshot 2026-08-05 061150 (1).png
    PR 1 Pneumatic test cert (1) (1).pdf
Předpověď počasí pro stavbu
Aktuální počasí na pracovišti

Nedostupné


Pozorování vycházející z - Nedostupné
Časové pásmo - severoamerický východní standardní čas
Předpověď – pondělí, 10 srpna

Nedostupné


Časové pásmo - severoamerický východní standardní čas
Zítra - úterý, 11 srpna

Nedostupné


Důležité dokumenty pracoviště
Novinka na pracovišti?

Znáte požadavky na OOPP pro toto pracoviště?

Ujistěte se, zda máte pro první den na pracovišti správné bezpečnostní vybavení.

Zobrazit požadavky na OOPP ke stavbě

Po příjezdu na místo můžete začít pracovat dříve.

Jakmile budete moci, dokončete registraci do pracoviště online, a ušetřete si tak čas.

Začít registraci

Novinka na pracovišti?

Znáte požadavky na OOPP pro toto pracoviště?

Ujistěte se, zda máte pro první den na pracovišti správné bezpečnostní vybavení.

Zobrazit požadavky na OOPP ke stavbě

Novinka na pracovišti?

Po příjezdu na místo můžete začít pracovat dříve.

Jakmile budete moci, dokončete registraci do pracoviště online, a ušetřete si tak čas.

Začít registraci