QTS - NAL2 DC1
近期公告
  • 18th 三月 2026, RNO4 Fire Protection Systems Going Live

    Team,

    For everyone's awareness there is a final TCO Inspection today with the Fire Marshall at 15:00 for clouds 3 & 4 and power rooms 3 & 4. After said inspection systems will be fully live in a permanent state moving forward.

    Again, this is for clouds 300 400 and the associated power rooms in RNO4 - please treat these as live systems moving forward.

  • 11th 三月 2026, We are currently under a tornado watch until noon!

    If severe weather occurs:
    • Seek shelter at the lowest level of the building.
    • Stay away from doors and windows.
    If time permits, secure the site:
    • Secure loose materials (plywood, decking, foam board, tarps, etc.).
    • Lower or secure crane booms or allow them to weathervane.
    • Brace freestanding or unsecured walls/form panels.
    Tornado Warning
    • If we need to evacuate, a notification with be sent via HammerTech/GroupMe.
    Lightning- Within 10 miles
    • Stop all exposed elevated work.
    Lightning- Within 6 miles
    • Stop all outdoor work.
    Lightning updates every 30 minutes.

  • 11th 三月 2026, Severe Weather

    Lightning is 11 miles from our site. All outside work can resume. Please stay tuned for updates throughout the day as possible severe weather continues to roll through.

现场天气预报
当前现场天气

不可用


观测信息来自 - 不可用
时区 - 北美东部标准时间
预测 - 星期四、2 四月

不可用


时区 - 北美东部标准时间
明天 - 星期五, 3 四月

不可用


重要现场文件
刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册

刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

刚到这个现场吗?

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册