QTS - NAL2 DC1 - Veřejná stránka projektu
-
14th července 2025,
All
We will be energizing Pods A-R2100 at DC2 at 7am on Tuesday 07.015.25. the North side of the Gen yard and the west corridor will be shut down to unauthorized personnel during energization. Please adhere to all CAZs, Signage and barricades. -
10th července 2025, Lightning standown
Lightning is 3 miles out. All exterior work must stop. Please monitor group me for when the lightning subsides. Must be over 6 miles away for exterior ground work and over 10 for elevated exterior work.
-
01st července 2025, 24-48 hour energization notice
All
We will be energizing HSE-SWR (house switch gear) on 07.02.25 at 11am in DC1. All unauthorized personnel must vacate the area. Please pay attention to all signage, barricades, and CAZs
Aktuální počasí na pracovišti
Nedostupné
Časové pásmo - severoamerický východní standardní čas
Předpověď – čtvrtek, 17 července
Nedostupné
Zítra - pátek, 18 července
Nedostupné
Znáte požadavky na OOPP pro toto pracoviště?
Ujistěte se, zda máte pro první den na pracovišti správné bezpečnostní vybavení.
Po příjezdu na místo můžete začít pracovat dříve.
Jakmile budete moci, dokončete registraci do pracoviště online, a ušetřete si tak čas.
Znáte požadavky na OOPP pro toto pracoviště?
Ujistěte se, zda máte pro první den na pracovišti správné bezpečnostní vybavení.
Po příjezdu na místo můžete začít pracovat dříve.
Jakmile budete moci, dokončete registraci do pracoviště online, a ušetřete si tak čas.