QTS - NAL2 DC1
Recent Bulletins
  • 11th September 2025, 24-48 hour Energization

    Team
    We will be energizing Crac Units 1200 1-25 and the reserve bus today in the 1100 and 1200 gallerys. Please adhere to all safety procedures, signage, barricades & signage that will restrict access to these areas.

  • 09th September 2025, 24-48 hour energization

    All
    We will be energizing 1200 STSs at 4:30pm today 09.09.25 in the west gallery 2nd level. Area will be barricaded and only qualified personnel will be allowed in the work area. all work to resume after energization.

  • 05th September 2025, Cosco RNO 5 Fire Suppression Testing

    Pneumatic testing of RNO5 fire suppression systems over power rooms 605, 606, 607, 407, 406, 405, 507, 508, 509 at 40psi from 9/6 2pm- 9/9 10am. These room will not be accessible for the duration of testing.

    Attachments :
    Power room 4 5 6 .pdf
    Aboveground Test Cert copy .pdf
    IMG_0383.jpg
    Switch5 system 5&6.pdf
    System 14.pdf
Site Weather Forecast
Current Site Weather

Unavailable


Observation sourced from - Unavailable
Time Zone - Eastern Standard Time
Forecast - Sunday, 14 September

Unavailable


Time Zone - Eastern Standard Time
Tomorrow - Monday, 15 September

Unavailable


Important Site Documents
New to Site?

Do you know the PPE Requirements for this site?

Ensure you have the correct safety equipment for your first day at the site.

View Site PPE Requirements

Get started working sooner when you arrive on site.

Enroll online at your convenience and save yourself time.

Begin Enrollment

New to Site?

Do you know the PPE Requirements for this site?

Ensure you have the correct safety equipment for your first day at the site.

View Site PPE Requirements

New to Site?

Get started working sooner when you arrive on site.

Enroll online at your convenience and save yourself time.

Begin Enrollment