  • 11th 9월 2025, 24-48 hour Energization

    Team
    We will be energizing Crac Units 1200 1-25 and the reserve bus today in the 1100 and 1200 gallerys. Please adhere to all safety procedures, signage, barricades & signage that will restrict access to these areas.

  • 09th 9월 2025, 24-48 hour energization

    All
    We will be energizing 1200 STSs at 4:30pm today 09.09.25 in the west gallery 2nd level. Area will be barricaded and only qualified personnel will be allowed in the work area. all work to resume after energization.

  • 05th 9월 2025, Cosco RNO 5 Fire Suppression Testing

    Pneumatic testing of RNO5 fire suppression systems over power rooms 605, 606, 607, 407, 406, 405, 507, 508, 509 at 40psi from 9/6 2pm- 9/9 10am. These room will not be accessible for the duration of testing.

    첨부 파일 :
    Power room 4 5 6 .pdf
    Aboveground Test Cert copy .pdf
    IMG_0383.jpg
    Switch5 system 5&6.pdf
    System 14.pdf
현장 날씨 예보
현재 현장 날씨

사용할 수 없음


관찰 출처 - 사용할 수 없음
시간대 - 미 동부 표준시
예측 - 일요일, 14 9월

사용할 수 없음


시간대 - 미 동부 표준시
내일 - 월요일, 15 9월

사용할 수 없음


중요한 현장 문서
현장에 처음 오셨나요?

이 현장의 개인 보호 장비(PPE) 요구 사항을 알고 있습니까?

현장 첫날에 올바른 안전 장비를 갖추고 있는지 확인하십시오.

현장 개인 보호 장비 요구 사항 보기

현장에 도착하면 더 빨리 작업을 시작하세요.

편리한 시간에 온라인으로 현장 등록을 완료하고 시간을 절약하세요.

등록 시작

현장에 처음 오셨나요?

이 현장의 개인 보호 장비(PPE) 요구 사항을 알고 있습니까?

현장 첫날에 올바른 안전 장비를 갖추고 있는지 확인하십시오.

현장 개인 보호 장비 요구 사항 보기

현장에 처음 오셨나요?

현장에 도착하면 더 빨리 작업을 시작하세요.

편리한 시간에 온라인으로 현장 등록을 완료하고 시간을 절약하세요.

등록 시작