  • 10th september 2025, (CO) Hazards and Safety Protocols Maruchan

    All,

    Take a moment to review the attached document regarding carbon monoxide (CO) hazards and safety protocols. Note that most gas monitoring devices are set to factory settings and may need to be adjusted to meet our site standards.

    General Gas Monitoring
    • CO at 50ppm: When the monitor detects 50ppm, implement additional measures:
    o Use displacement fans inside the building.
    o Remove combustion-powered equipment from the building, such as:
     Welding machines
     Boom lifts
     Gas-powered equipment
     Ect…
    o If a subcontractor wants to utilized gas monitoring the following needs to be in place. This is for non-confined space activities.
     Loggers name
     Quad monitor Type:
     Quad monitor Calibrations Date:
     Time of the event:
     Location of the active readings:
     CO Readings at time of the evacuation:
     Chart of Active Read:
    • CO at 200ppm: Evacuate the building until CO levels drop below 50ppm.
    Please remember that symptoms can occur at CO levels between 200ppm and 400ppm, similar to placing your face near an exhaust pipe.



    Tillegg :
    Carbon Monoxide (CO) Hazard - Protocal_.pdf
  • 05th september 2025, Cosco RNO 5 Fire Suppression Testing

    Pneumatic testing of RNO5 fire suppression systems over power rooms 605, 606, 607, 407, 406, 405, 507, 508, 509 at 40psi from 9/6 2pm- 9/9 10am. These room will not be accessible for the duration of testing.

    Tillegg :
    Power room 4 5 6 .pdf
    Aboveground Test Cert copy .pdf
    IMG_0383.jpg
    Switch5 system 5&6.pdf
    System 14.pdf
  • 03rd september 2025, RNO4 Area L Power Rooms Pressure Test 9/3/25

    All - Please see below details for ACCO Pressure test to take place in RNO4 tomorrow 9/3/25.

    Location: RNO4 Sector L Power Rooms (Vaults 7 & 8)

    System: 10" Chilled Water Piping
    Pressure: 150 PSI Hydrostatic
    Test Duration: 3 hours (1 hour fill 2 hours test)

    Exclusion zone will only prohibit work taking place above 10' from finished floor.
    Exclusion starts: 9/3/2025 3:00PM
    Exclusion expected end: 9/3/25 6:00PM

    Tillegg :
    Sector L Test #L1 10 inch Markup Power Rooms.pdf
Nettstedets værmelding
Vær på anleggsted

Utilgjengelig


Observasjon hentet fra - Utilgjengelig
Tidssone - normaltid for den nordamerikanske stillehavskysten
Værmelding – søndag, 14 september

Utilgjengelig


Tidssone - normaltid for den nordamerikanske stillehavskysten
I morgen - måndag, 15 september

Utilgjengelig


Viktige dokumenter for anleggsplassen
Ny på anleggsplassen?

Vet du om PVU-kravene for dette anlegget?

Sørg for at du har riktig sikkerhetsutstyr for den første dagen på anleggsplassen.

Se PPE-kravene til nettstedet

Kom i gang med arbeidet tidligere når du ankommer anleggsplassen.

Fullfør nettstedsregistreringen din online når det passer deg og spar tid.

Start registrering

Ny på anleggsplassen?

Vet du om PVU-kravene for dette anlegget?

Sørg for at du har riktig sikkerhetsutstyr for den første dagen på anleggsplassen.

Se PPE-kravene til nettstedet

Ny på anleggsplassen?

Kom i gang med arbeidet tidligere når du ankommer anleggsplassen.

Fullfør nettstedsregistreringen din online når det passer deg og spar tid.

Start registrering