  • 01st July 2025, Extension Ladders

    Gray Practices a “ladders last” policy. Extension ladders are only to be used if all other means of getting to elevated work are not unfeasible.
    Ladders shall be inspected before each use by a competent person to check for missing rungs, bolts, cleats, screws, and loose components. Where a ladder has these or other defects, it must be immediately marked as defective or tagged with “Do Not Use” or similar language.
    All ladders should be fit for the task at hand and rated for the correct weight with a legible sticker on that is visible.
    A Ladder should be used at a 4:1 angle; for every 4 feet in height, the bottom of the ladder is 1 foot out. Extended 42” above the landing, on Gray’s site.
    Ladders should be secured at top and bottom to prevent accidental displacement.
    Workers should not carry any objects when climbing; use a tagline to raise or lower loads. Make sure any overhead work is barricaded, or a spotter is present.

    Attachments :
    Safety Moments Maruchan 7-1-25.pdf
  • 16th May 2025, Energization

    Phase 9 081
    DAHA’s ; EF ; PDC’s CPP panels

  • 25th April 2025, 48 hour MVG 01/04 Energization

    All

    This is a 48hr-energization notice informing everyone onsite at QTS NAL2 that we be energizing medium voltage gears 1 and 4 (MVG-01/04) in the Gen Yard on the west side of DC1 at 12pm on 04.28.25. The entire Gen yard and the substation will be a no work zone for all Unauthorized Personnel. Violation of any CAZ (controlled access zone) will result in immediate removal from the project.

Site Weather Forecast
Current Site Weather

Unavailable


Observation sourced from - Unavailable
Time Zone - Pacific Standard Time
Forecast - Friday, 4 July

Unavailable


Time Zone - Pacific Standard Time
Tomorrow - Saturday, 5 July

Unavailable


Important Site Documents
New to Site?

Do you know the PPE Requirements for this site?

Ensure you have the correct safety equipment for your first day at the site.

View Site PPE Requirements

Get started working sooner when you arrive on site.

Enroll online at your convenience and save yourself time.

Begin Enrollment

New to Site?

Do you know the PPE Requirements for this site?

Ensure you have the correct safety equipment for your first day at the site.

View Site PPE Requirements

New to Site?

Get started working sooner when you arrive on site.

Enroll online at your convenience and save yourself time.

Begin Enrollment