Maruchan
Ngā Pānuirongo Hōu
  • 10th Mahuru 2025, (CO) Hazards and Safety Protocols Maruchan

    All,

    Take a moment to review the attached document regarding carbon monoxide (CO) hazards and safety protocols. Note that most gas monitoring devices are set to factory settings and may need to be adjusted to meet our site standards.

    General Gas Monitoring
    • CO at 50ppm: When the monitor detects 50ppm, implement additional measures:
    o Use displacement fans inside the building.
    o Remove combustion-powered equipment from the building, such as:
     Welding machines
     Boom lifts
     Gas-powered equipment
     Ect…
    o If a subcontractor wants to utilized gas monitoring the following needs to be in place. This is for non-confined space activities.
     Loggers name
     Quad monitor Type:
     Quad monitor Calibrations Date:
     Time of the event:
     Location of the active readings:
     CO Readings at time of the evacuation:
     Chart of Active Read:
    • CO at 200ppm: Evacuate the building until CO levels drop below 50ppm.
    Please remember that symptoms can occur at CO levels between 200ppm and 400ppm, similar to placing your face near an exhaust pipe.



    Ngā Āpitihanga :
    Carbon Monoxide (CO) Hazard - Protocal_.pdf
  • 05th Mahuru 2025, Cosco RNO 5 Fire Suppression Testing

    Pneumatic testing of RNO5 fire suppression systems over power rooms 605, 606, 607, 407, 406, 405, 507, 508, 509 at 40psi from 9/6 2pm- 9/9 10am. These room will not be accessible for the duration of testing.

    Ngā Āpitihanga :
    Power room 4 5 6 .pdf
    Aboveground Test Cert copy .pdf
    IMG_0383.jpg
    Switch5 system 5&6.pdf
    System 14.pdf
  • 03rd Mahuru 2025, RNO4 Area L Power Rooms Pressure Test 9/3/25

    All - Please see below details for ACCO Pressure test to take place in RNO4 tomorrow 9/3/25.

    Location: RNO4 Sector L Power Rooms (Vaults 7 & 8)

    System: 10" Chilled Water Piping
    Pressure: 150 PSI Hydrostatic
    Test Duration: 3 hours (1 hour fill 2 hours test)

    Exclusion zone will only prohibit work taking place above 10' from finished floor.
    Exclusion starts: 9/3/2025 3:00PM
    Exclusion expected end: 9/3/25 6:00PM

    Ngā Āpitihanga :
    Sector L Test #L1 10 inch Markup Power Rooms.pdf
Matapae Huarere Paemahi
Huarere Paemahi Onāianei

Korewātea


Kitenga i pūtake mai i - Korewātea
Rohe Wā - Wā Arowhānui Kiwa
Matapae - Rātapu, 14 Mahuru

Korewātea


Rohe Wā - Wā Arowhānui Kiwa
Āpōpō - Rāhina, 15 Mahuru

Korewātea


Ngā Tuhinga Paemahi Hira
Tauhōu ki te Paemahi?

E mōhio ana rānei koe ki ngā Whakaritenga PPE mō tēnei paemahi?

Āta tiaki kei a koe ngā taputapu haumarutanga tika mō tō rā tuatahi i te paemahi.

Tiro Whakaritenga PPE Paemahi

Tīmata wawe ake ina tae koe ki te paemahi.

Whakaotia tuihonotia tō rēhitatanga paemahi ina pai koe hei penapena tāima.

Tīmataria te Rēhitatanga

Tauhōu ki te Paemahi?

E mōhio ana rānei koe ki ngā Whakaritenga PPE mō tēnei paemahi?

Āta tiaki kei a koe ngā taputapu haumarutanga tika mō tō rā tuatahi i te paemahi.

Tiro Whakaritenga PPE Paemahi

Tauhōu ki te Paemahi?

Tīmata wawe ake ina tae koe ki te paemahi.

Whakaotia tuihonotia tō rēhitatanga paemahi ina pai koe hei penapena tāima.

Tīmataria te Rēhitatanga