Maruchan
Recent Bulletins
  • 10th September 2025, (CO) Hazards and Safety Protocols Maruchan

    All,

    Take a moment to review the attached document regarding carbon monoxide (CO) hazards and safety protocols. Note that most gas monitoring devices are set to factory settings and may need to be adjusted to meet our site standards.

    General Gas Monitoring
    • CO at 50ppm: When the monitor detects 50ppm, implement additional measures:
    o Use displacement fans inside the building.
    o Remove combustion-powered equipment from the building, such as:
     Welding machines
     Boom lifts
     Gas-powered equipment
     Ect…
    o If a subcontractor wants to utilized gas monitoring the following needs to be in place. This is for non-confined space activities.
     Loggers name
     Quad monitor Type:
     Quad monitor Calibrations Date:
     Time of the event:
     Location of the active readings:
     CO Readings at time of the evacuation:
     Chart of Active Read:
    • CO at 200ppm: Evacuate the building until CO levels drop below 50ppm.
    Please remember that symptoms can occur at CO levels between 200ppm and 400ppm, similar to placing your face near an exhaust pipe.



    Attachments :
    Carbon Monoxide (CO) Hazard - Protocal_.pdf
  • 05th September 2025, Cosco RNO 5 Fire Suppression Testing

    Pneumatic testing of RNO5 fire suppression systems over power rooms 605, 606, 607, 407, 406, 405, 507, 508, 509 at 40psi from 9/6 2pm- 9/9 10am. These room will not be accessible for the duration of testing.

    Attachments :
    Power room 4 5 6 .pdf
    Aboveground Test Cert copy .pdf
    IMG_0383.jpg
    Switch5 system 5&6.pdf
    System 14.pdf
  • 03rd September 2025, RNO4 Area L Power Rooms Pressure Test 9/3/25

    All - Please see below details for ACCO Pressure test to take place in RNO4 tomorrow 9/3/25.

    Location: RNO4 Sector L Power Rooms (Vaults 7 & 8)

    System: 10" Chilled Water Piping
    Pressure: 150 PSI Hydrostatic
    Test Duration: 3 hours (1 hour fill 2 hours test)

    Exclusion zone will only prohibit work taking place above 10' from finished floor.
    Exclusion starts: 9/3/2025 3:00PM
    Exclusion expected end: 9/3/25 6:00PM

    Attachments :
    Sector L Test #L1 10 inch Markup Power Rooms.pdf
Site Weather Forecast
Current Site Weather

Unavailable


Observation sourced from - Unavailable
Time Zone - Pacific Standard Time
Forecast - Sunday, 14 September

Unavailable


Time Zone - Pacific Standard Time
Tomorrow - Monday, 15 September

Unavailable


Important Site Documents
New to Site?

Do you know the PPE Requirements for this site?

Ensure you have the correct safety equipment for your first day at the site.

View Site PPE Requirements

Get started working sooner when you arrive on site.

Enrol online at your convenience and save yourself time.

Begin Enrolment

New to Site?

Do you know the PPE Requirements for this site?

Ensure you have the correct safety equipment for your first day at the site.

View Site PPE Requirements

New to Site?

Get started working sooner when you arrive on site.

Enrol online at your convenience and save yourself time.

Begin Enrolment