  • 10th septembre 2025, (CO) Hazards and Safety Protocols Maruchan

    All,

    Take a moment to review the attached document regarding carbon monoxide (CO) hazards and safety protocols. Note that most gas monitoring devices are set to factory settings and may need to be adjusted to meet our site standards.

    General Gas Monitoring
    • CO at 50ppm: When the monitor detects 50ppm, implement additional measures:
    o Use displacement fans inside the building.
    o Remove combustion-powered equipment from the building, such as:
     Welding machines
     Boom lifts
     Gas-powered equipment
     Ect…
    o If a subcontractor wants to utilized gas monitoring the following needs to be in place. This is for non-confined space activities.
     Loggers name
     Quad monitor Type:
     Quad monitor Calibrations Date:
     Time of the event:
     Location of the active readings:
     CO Readings at time of the evacuation:
     Chart of Active Read:
    • CO at 200ppm: Evacuate the building until CO levels drop below 50ppm.
    Please remember that symptoms can occur at CO levels between 200ppm and 400ppm, similar to placing your face near an exhaust pipe.



    Pièces jointes :
    Carbon Monoxide (CO) Hazard - Protocal_.pdf
  • 05th septembre 2025, Cosco RNO 5 Fire Suppression Testing

    Pneumatic testing of RNO5 fire suppression systems over power rooms 605, 606, 607, 407, 406, 405, 507, 508, 509 at 40psi from 9/6 2pm- 9/9 10am. These room will not be accessible for the duration of testing.

    Pièces jointes :
    Power room 4 5 6 .pdf
    Aboveground Test Cert copy .pdf
    IMG_0383.jpg
    Switch5 system 5&6.pdf
    System 14.pdf
  • 03rd septembre 2025, RNO4 Area L Power Rooms Pressure Test 9/3/25

    All - Please see below details for ACCO Pressure test to take place in RNO4 tomorrow 9/3/25.

    Location: RNO4 Sector L Power Rooms (Vaults 7 & 8)

    System: 10" Chilled Water Piping
    Pressure: 150 PSI Hydrostatic
    Test Duration: 3 hours (1 hour fill 2 hours test)

    Exclusion zone will only prohibit work taking place above 10' from finished floor.
    Exclusion starts: 9/3/2025 3:00PM
    Exclusion expected end: 9/3/25 6:00PM

    Pièces jointes :
    Sector L Test #L1 10 inch Markup Power Rooms.pdf
Prévisions météo pour le site
Météo sur le site actuel

Indisponible


Observation provenant de - Indisponible
Fuseau horaire - heure normale du Pacifique nord-américain
Prévision - dimanche, 14 septembre

Indisponible


Fuseau horaire - heure normale du Pacifique nord-américain
Demain - lundi, 15 septembre

Indisponible


Documents importants sur le site
Nouveau sur le site ?

Connaissez-vous les exigences en matière de PPE pour ce site ?

Assurez-vous que vous avez l'équipement de sécurité approprié lors de votre premier jour sur le site.

Afficher les exigences PPE pour le site

Commencez à travailler plus tôt dès votre arrivée sur le site.

Complétez votre inscription du site en ligne à votre convenance et gagnez du temps par la même occasion.

Commencer l'inscription

Nouveau sur le site ?

Connaissez-vous les exigences en matière de PPE pour ce site ?

Assurez-vous que vous avez l'équipement de sécurité approprié lors de votre premier jour sur le site.

Afficher les exigences PPE pour le site

Nouveau sur le site ?

Commencez à travailler plus tôt dès votre arrivée sur le site.

Complétez votre inscription du site en ligne à votre convenance et gagnez du temps par la même occasion.

Commencer l'inscription