Amazon 1DC OH - सार्वजनिक प्रोजेक्ट साइट
-
29th अगस्त 2026, Nitrogen Pressure-Testing Plug Power H2 Dispensers Amazon OH 1DC 9am-6pm
o Testing duration is expected to be 8 hours, starting at 0900 AM
o All system tubing is 0.38” x 0.065” wall, 0.245 inner diameter.
o Target test pressure is 7,180 psi
o Areas being tested and exclusion zones (zones determined using Gray’s safe distance calculator):
Outdoor hydrogen transfer station (HTS) and field manifold
• 80’ exclusion zone
o Danger tape cordon with appropriate signage around perimeter
Roof area
• 80’ exclusion zone
o Danger tape cordon with appropriate signage at access points (scaffolding)
5 Dispensers (One group of 3 and one group of 2)
• 13’ exclusion zone (25’ is Plug’s standard and will be utilized)
o Danger tape cordon with appropriate signage around perimeter -
22nd अगस्त 2026, ALL CLEAR : LIGHTNING STAND DOWN OVER
GRAY CONSTRUCTION RNO 4-5-6
LIGHTNING STORM HAS PASSED. ALL WORK CAN RESUME ON ROOF AND EXTERIOR . -
15th अगस्त 2026, Energization-1HL1 and corresponding lightning circuits
Location: Areas C, D, G, and H
Zone: Electrical Room
Time: 2-6pm
Locations where energizing will take place will be barricaded off.
साइट का मौजूदा मौसम
उपलब्ध नहीं है
समय क्षेत्र - उत्तरी अमेरिकी पूर्वी मानक समय
पूर्वानुमान - सोमवार, 31 अगस्त
उपलब्ध नहीं है
कल - मंगलवार, 1 सितम्बर
उपलब्ध नहीं है
क्या आप इस साइट के लिए आवश्यक PPE के बारे में जानते हैं?
सुनिश्चित करें कि आपके पास साइट पर पहले दिन के लिए सही सुरक्षा इक्विपमेंट हैं।
जब आप साइट पर पहुंचें, तो जल्द से जल्द काम करना शुरू कर दें।
अपनी सुविधा के अनुसार अपना साइट रजिस्ट्रेशन ऑनलाइन पूरा करें और अपना समय बचाएँ।
क्या आप इस साइट के लिए आवश्यक PPE के बारे में जानते हैं?
सुनिश्चित करें कि आपके पास साइट पर पहले दिन के लिए सही सुरक्षा इक्विपमेंट हैं।
जब आप साइट पर पहुंचें, तो जल्द से जल्द काम करना शुरू कर दें।
अपनी सुविधा के अनुसार अपना साइट रजिस्ट्रेशन ऑनलाइन पूरा करें और अपना समय बचाएँ।