Amazon 1DC OH - Offentlig projektarbejdsplads
-
29th august 2026, Nitrogen Pressure-Testing Plug Power H2 Dispensers Amazon OH 1DC 9am-6pm
o Testing duration is expected to be 8 hours, starting at 0900 AM
o All system tubing is 0.38” x 0.065” wall, 0.245 inner diameter.
o Target test pressure is 7,180 psi
o Areas being tested and exclusion zones (zones determined using Gray’s safe distance calculator):
Outdoor hydrogen transfer station (HTS) and field manifold
• 80’ exclusion zone
o Danger tape cordon with appropriate signage around perimeter
Roof area
• 80’ exclusion zone
o Danger tape cordon with appropriate signage at access points (scaffolding)
5 Dispensers (One group of 3 and one group of 2)
• 13’ exclusion zone (25’ is Plug’s standard and will be utilized)
o Danger tape cordon with appropriate signage around perimeter -
22nd august 2026, ALL CLEAR : LIGHTNING STAND DOWN OVER
GRAY CONSTRUCTION RNO 4-5-6
LIGHTNING STORM HAS PASSED. ALL WORK CAN RESUME ON ROOF AND EXTERIOR . -
15th august 2026, Energization-1HL1 and corresponding lightning circuits
Location: Areas C, D, G, and H
Zone: Electrical Room
Time: 2-6pm
Locations where energizing will take place will be barricaded off.
Aktuelt vejr på stedet
Utilgængelig
Tidszone - Eastern-normaltid
Prognose - mandag, 31 august
Utilgængelig
Imorgen - tirsdag, 1 september
Utilgængelig
Kender du kravene for personlige værnemidler til dette sted?
Sørg for, at du har det korrekte sikkerhedsudstyr til din første dag på arbejdspladsen.
Kom hurtigere i gang med arbejdet, når du ankommer til stedet.
Afslut din webstedsregistrering online, når det passer dig, og spar tid.
Kender du kravene for personlige værnemidler til dette sted?
Sørg for, at du har det korrekte sikkerhedsudstyr til din første dag på arbejdspladsen.
Kom hurtigere i gang med arbejdet, når du ankommer til stedet.
Afslut din webstedsregistrering online, når det passer dig, og spar tid.