近期公告
  • 12th 九月 2025, STAMPED CONCRETE BEING SEALED IN FRONT OF MAIN OFFICE.

    THE STAMPED CONCRETE IN FRONT OF THE MAIN OFFICE IS IN THE PROCESS OF BEING SEALED. THERE IS NOT TO BE ANY FOOT TRAFFIC OR ACCESS UNTIL 9/15 IN THIS AREA. IT WILL BE BARRICADED OFF AND NOT ACCESSIBLE.

  • 05th 九月 2025, Cosco RNO 5 Fire Suppression Testing

    Pneumatic testing of RNO5 fire suppression systems over power rooms 605, 606, 607, 407, 406, 405, 507, 508, 509 at 40psi from 9/6 2pm- 9/9 10am. These room will not be accessible for the duration of testing.

    附件 :
    Power room 4 5 6 .pdf
    Aboveground Test Cert copy .pdf
    IMG_0383.jpg
    Switch5 system 5&6.pdf
    System 14.pdf
  • 03rd 九月 2025, RNO4 Area L Power Rooms Pressure Test 9/3/25

    All - Please see below details for ACCO Pressure test to take place in RNO4 tomorrow 9/3/25.

    Location: RNO4 Sector L Power Rooms (Vaults 7 & 8)

    System: 10" Chilled Water Piping
    Pressure: 150 PSI Hydrostatic
    Test Duration: 3 hours (1 hour fill 2 hours test)

    Exclusion zone will only prohibit work taking place above 10' from finished floor.
    Exclusion starts: 9/3/2025 3:00PM
    Exclusion expected end: 9/3/25 6:00PM

    附件 :
    Sector L Test #L1 10 inch Markup Power Rooms.pdf
现场天气预报
当前现场天气

不可用


观测信息来自 - 不可用
时区 - 北美山区标准时间
预测 - 星期日、14 九月

不可用


时区 - 北美山区标准时间
明天 - 星期一, 15 九月

不可用


重要现场文件
刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册

刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

刚到这个现场吗?

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册