Project Mustang - Offentlig prosjektsted
-
12th september 2025, STAMPED CONCRETE BEING SEALED IN FRONT OF MAIN OFFICE.
THE STAMPED CONCRETE IN FRONT OF THE MAIN OFFICE IS IN THE PROCESS OF BEING SEALED. THERE IS NOT TO BE ANY FOOT TRAFFIC OR ACCESS UNTIL 9/15 IN THIS AREA. IT WILL BE BARRICADED OFF AND NOT ACCESSIBLE.
-
05th september 2025, Cosco RNO 5 Fire Suppression Testing
Pneumatic testing of RNO5 fire suppression systems over power rooms 605, 606, 607, 407, 406, 405, 507, 508, 509 at 40psi from 9/6 2pm- 9/9 10am. These room will not be accessible for the duration of testing.
Tillegg :
Power room 4 5 6 .pdf
Aboveground Test Cert copy .pdf
IMG_0383.jpg
Switch5 system 5&6.pdf
System 14.pdf
-
03rd september 2025, RNO4 Area L Power Rooms Pressure Test 9/3/25
All - Please see below details for ACCO Pressure test to take place in RNO4 tomorrow 9/3/25.
Tillegg :
Location: RNO4 Sector L Power Rooms (Vaults 7 & 8)
System: 10" Chilled Water Piping
Pressure: 150 PSI Hydrostatic
Test Duration: 3 hours (1 hour fill 2 hours test)
Exclusion zone will only prohibit work taking place above 10' from finished floor.
Exclusion starts: 9/3/2025 3:00PM
Exclusion expected end: 9/3/25 6:00PM
Sector L Test #L1 10 inch Markup Power Rooms.pdf
Vær på anleggsted
Utilgjengelig
Tidssone - normaltid for Rocky Mountains (USA)
Værmelding – søndag, 14 september
Utilgjengelig
I morgen - måndag, 15 september
Utilgjengelig
Vet du om PVU-kravene for dette anlegget?
Sørg for at du har riktig sikkerhetsutstyr for den første dagen på anleggsplassen.
Kom i gang med arbeidet tidligere når du ankommer anleggsplassen.
Fullfør nettstedsregistreringen din online når det passer deg og spar tid.
Vet du om PVU-kravene for dette anlegget?
Sørg for at du har riktig sikkerhetsutstyr for den første dagen på anleggsplassen.
Kom i gang med arbeidet tidligere når du ankommer anleggsplassen.
Fullfør nettstedsregistreringen din online når det passer deg og spar tid.