  • 12th 9月 2025, STAMPED CONCRETE BEING SEALED IN FRONT OF MAIN OFFICE.

    THE STAMPED CONCRETE IN FRONT OF THE MAIN OFFICE IS IN THE PROCESS OF BEING SEALED. THERE IS NOT TO BE ANY FOOT TRAFFIC OR ACCESS UNTIL 9/15 IN THIS AREA. IT WILL BE BARRICADED OFF AND NOT ACCESSIBLE.

  • 05th 9月 2025, Cosco RNO 5 Fire Suppression Testing

    Pneumatic testing of RNO5 fire suppression systems over power rooms 605, 606, 607, 407, 406, 405, 507, 508, 509 at 40psi from 9/6 2pm- 9/9 10am. These room will not be accessible for the duration of testing.

    添付ファイル :
    Power room 4 5 6 .pdf
    Aboveground Test Cert copy .pdf
    IMG_0383.jpg
    Switch5 system 5&6.pdf
    System 14.pdf
  • 03rd 9月 2025, RNO4 Area L Power Rooms Pressure Test 9/3/25

    All - Please see below details for ACCO Pressure test to take place in RNO4 tomorrow 9/3/25.

    Location: RNO4 Sector L Power Rooms (Vaults 7 & 8)

    System: 10" Chilled Water Piping
    Pressure: 150 PSI Hydrostatic
    Test Duration: 3 hours (1 hour fill 2 hours test)

    Exclusion zone will only prohibit work taking place above 10' from finished floor.
    Exclusion starts: 9/3/2025 3:00PM
    Exclusion expected end: 9/3/25 6:00PM

    添付ファイル :
    Sector L Test #L1 10 inch Markup Power Rooms.pdf
現場天気予報
現在の現場の天気

利用できません


観察元 - 利用できません
タイムゾーン - アメリカ山地標準時
予測 - 日曜日, 14 9月

利用できません


タイムゾーン - アメリカ山地標準時
明日 - 月曜日, 15 9月

利用できません


重要な現場書類
現場に初めてですか?

この現場のPPE要件を知っていますか?

現場での初日に備えて、適切な安全装備を確保してください。

現場のPPE要件を表示

現場に到着したら、すぐに作業を開始できます。

ご都合の良い時にオンラインで現場登録を完了し、時間を節約してください。

登録を開始

現場に初めてですか?

この現場のPPE要件を知っていますか?

現場での初日に備えて、適切な安全装備を確保してください。

現場のPPE要件を表示

現場に初めてですか?

現場に到着したら、すぐに作業を開始できます。

ご都合の良い時にオンラインで現場登録を完了し、時間を節約してください。

登録を開始