18th Mart 2026, RNO4 Fire Protection Systems Going Live
Team,
For everyone's awareness there is a final TCO Inspection today with the Fire Marshall at 15:00 for clouds 3 & 4 and power rooms 3 & 4. After said inspection systems will be fully live in a permanent state moving forward.
Again, this is for clouds 300 400 and the associated power rooms in RNO4 - please treat these as live systems moving forward. -
11th Mart 2026, We are currently under a tornado watch until noon today!
If severe weather occurs:
• Seek shelter at the lowest level of the building.
• Stay away from doors and windows.
If time permits, secure the site:
• Secure loose materials (plywood, decking, foam board, tarps, etc.).
• Lower or secure crane booms or allow them to weathervane.
• Brace freestanding or unsecured walls/form panels.
Tornado Warning
• If we need to evacuate, a notification with be sent via HammerTech/GroupMe.
Lightning- Within 10 miles
• Stop all exposed elevated work.
Lightning- Within 6 miles
• Stop all outdoor work.
Lightning updates every 30 minutes. -
11th Mart 2026, Severe Weather
Lightning is 11 miles from our site. All outside work can resume. Please stay tuned for updates throughout the day as possible severe weather continues to roll through.
Geçerli Saha Hava Durumu
Kullanılamaz
Zaman Dilimi - Kuzey Amerika Doğu Standart Saati
Tahmin - Perşembe, 2 Nisan
Kullanılamaz
Yarın - Cuma, 3 Nisan
Kullanılamaz
Bu sahanın KKD Gereksinimlerini biliyor musunuz?
Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.
Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.
Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.
Bu sahanın KKD Gereksinimlerini biliyor musunuz?
Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.
Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.
Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.