QTS - NAL2 DC2
हाल के बुलेटिन
  • 01st जुलाई 2025, 24-48 hour energization notice

    All

    We will be energizing HSE-SWR (house switch gear) on 07.02.25 at 11am in DC1. All unauthorized personnel must vacate the area. Please pay attention to all signage, barricades, and CAZs

  • 01st जुलाई 2025, 48hour energization notice for Gens A21-R21

    We will be energizing shore power at GENs A21-R21 in Gen yard of DC1 on 07.03.25 at 9-11:30am. All unauthorized work in or near the equipment is to be stopped until energization is complete. Please be aware of and respect all barricades, CAZs and signage blocking off area.

  • 19th जून 2025, 48 hour energization notice

    All
    we will be energizing shore power in Gens G11 & R11 in gen yard of DC1. please adhere to all signage and barricades. Only authorized personnel to be allowed into equipment. NF

साइट पर मौसम का पूर्वानुमान
साइट का मौजूदा मौसम

उपलब्ध नहीं है


ऑब्जरवेशन- उपलब्ध नहीं है से लिया गया है
समय क्षेत्र - उत्तरी अमेरिकी पूर्वी मानक समय
पूर्वानुमान - बुधवार, 2 जुलाई

उपलब्ध नहीं है


समय क्षेत्र - उत्तरी अमेरिकी पूर्वी मानक समय
कल - गुरुवार, 3 जुलाई

उपलब्ध नहीं है


महत्वपूर्ण साइट दस्तावेज़
क्या आप साइट पर नए हैं?

क्या आप इस साइट के लिए आवश्यक PPE के बारे में जानते हैं?

सुनिश्चित करें कि आपके पास साइट पर पहले दिन के लिए सही सुरक्षा इक्विपमेंट हैं।

साइट PPE की आवश्यकताओं को देखें

जब आप साइट पर पहुंचें, तो जल्द से जल्द काम करना शुरू कर दें।

अपनी सुविधा के अनुसार अपना साइट रजिस्ट्रेशन ऑनलाइन पूरा करें और अपना समय बचाएँ।

रजिस्ट्रेशन शुरू करें

क्या आप साइट पर नए हैं?

क्या आप इस साइट के लिए आवश्यक PPE के बारे में जानते हैं?

सुनिश्चित करें कि आपके पास साइट पर पहले दिन के लिए सही सुरक्षा इक्विपमेंट हैं।

साइट PPE की आवश्यकताओं को देखें

क्या आप साइट पर नए हैं?

जब आप साइट पर पहुंचें, तो जल्द से जल्द काम करना शुरू कर दें।

अपनी सुविधा के अनुसार अपना साइट रजिस्ट्रेशन ऑनलाइन पूरा करें और अपना समय बचाएँ।

रजिस्ट्रेशन शुरू करें