15th 九月 2025, SITE SHUT DOWN 4PM 9/17
ALL INTERIOR WORK WILL BE SHUT DOWN AT 4PM ON 9/17 FOR AIR TESTING ON THE FIRE STANDPIPE SYSTEM IN THE BUILDING. PLEASE PLAN ALL WORK ACCORDINGLY.
-
15th 九月 2025, RNO4 Cloud 600 ROOF Piping Testing
Morning all,
This email is to notify all trade partners that there will be a test conducted today on the RNO4 Roof in cloud 600.
Location RNO4 cloud 6 ROOF
System: Chilled water
Pressure: 150 PSI
Duration: 2 hours
Start time: 9/15 1500
End Time: 9/15 1730
Questions? Have your FOREMAN contact Alex Pifer with Gray,
Appreciate your cooperation.
Thank you
-
05th 九月 2025, Cosco RNO 5 Fire Suppression Testing
Pneumatic testing of RNO5 fire suppression systems over power rooms 605, 606, 607, 407, 406, 405, 507, 508, 509 at 40psi from 9/6 2pm- 9/9 10am. These room will not be accessible for the duration of testing.
附件 :
Power room 4 5 6 .pdf
Aboveground Test Cert copy .pdf
IMG_0383.jpg
Switch5 system 5&6.pdf
System 14.pdf
当前现场天气
最近更新: 21:06
温度: 13C
风速: 15KMH
最大 风: 22KMH @15:06
最低温度: 5C @4:06
最高温度: 22C @16:03
阵风: 16KMH
最大风力: 30KMH @14:06
观测位置 - Pocatello、ID
时区 - 北美山区标准时间
预测 - 星期三、8 十月
sky is clear
最低: 7C 最大: 22C
预测位置 - Pocatello、ID
时区 - 北美山区标准时间
明天 - 星期四, 9 十月
sky is clear
最低: 10C 最大: 25C