AWS CMH098
Nylige bulletiner
  • 07th august 2026, ACE CONSTRUCTION POWER SHUT DOWN TRAILER CITY / ADMIN

    ALL PLEASE BE ADVISED

    CONSTRUCTION POWER IN TRAILER CITY
    WILL BE SHUT DOWN AS WELL AS THE LUNCH TENT AREA.
    POWER WILL BE OUT MAJORITY OF THE DAY.

    SHUT DOWN WILL BEGIN AT APPROXIMATELY 7 A.M

    IN ADDITION

    THERE WILL BE A SHUT DOWN ON BUILDING A - 098 ADMIN AREA PLEASE ENSURE ALL LIFTS ARE CHARGED AND PROVIDE YOUR EMPLOYEES WITH TASK LIGHTNING IF YOU PLAN TO CONTINUE WORKING
    SHUT DOWN FOR ADMIN WILL BEGIN AT 12 P.M WILL LAST 4 HOURS

  • 07th august 2026, Goyette

    Attention all personnel:
    Pressure testing will begin at 4:00 PM.

    Line filling will start at approximately 1:00 PM inside the mechanical room to allow the system to reach the required 100 psi.

    An exclusion zone at 4 Pm will be in effect during testing from the mechanical room, through the administrative hallway, to Column Line 10.

    Only authorized personnel are permitted within this area.
    Please obey all barricades and signage until the pressure test is complete and the area has been cleared.

    Thank you for your cooperation.

    Goyette

  • 07th august 2026, Goyette

    Attention all personnel:
    Pressure testing will begin at 4:00 PM.

    Line filling will start at approximately 1:00 PM inside the mechanical room to allow the system to reach the required 100 psi.

    An exclusion zone at 4 Pm will be in effect during testing from the mechanical room, through the administrative hallway, to Column Line 10.

    Only authorized personnel are permitted within this area.
    Please obey all barricades and signage until the pressure test is complete and the area has been cleared.

    Thank you for your cooperation.

    Goyette

Nettstedets værmelding
Vær på anleggsted

Utilgjengelig


Observasjon hentet fra - Utilgjengelig
Tidssone - normaltid for den nordamerikanske austkysten
Værmelding – måndag, 10 august

Utilgjengelig


Tidssone - normaltid for den nordamerikanske austkysten
I morgen - tysdag, 11 august

Utilgjengelig


Viktige dokumenter for anleggsplassen
Ny på anleggsplassen?

Vet du om PVU-kravene for dette anlegget?

Sørg for at du har riktig sikkerhetsutstyr for den første dagen på anleggsplassen.

Se PPE-kravene til nettstedet

Kom i gang med arbeidet tidligere når du ankommer anleggsplassen.

Fullfør nettstedsregistreringen din online når det passer deg og spar tid.

Start registrering

Ny på anleggsplassen?

Vet du om PVU-kravene for dette anlegget?

Sørg for at du har riktig sikkerhetsutstyr for den første dagen på anleggsplassen.

Se PPE-kravene til nettstedet

Ny på anleggsplassen?

Kom i gang med arbeidet tidligere når du ankommer anleggsplassen.

Fullfør nettstedsregistreringen din online når det passer deg og spar tid.

Start registrering