Powerhouse
最近のニュースレター
  • 05th 5月 2026, RNO4 Building in TEST MODE

    RNO4 Building is in TEST MODE, please be cautious with debris, dust, or smoke that can potentially activate the FIRE ALARM SYSTEM.

  • 03rd 5月 2026, Team, RNO4 Building is in TEST MODE please be cautious with debris, dust or smoke that can potentially activate the FIRE ALARM. Time: 6:30am to 2pm.

    Team,

    RNO4 Building is in TEST MODE please be cautious with debris, dust or smoke that can potentially activate the FIRE ALARM. Time: 6:30am to 2pm.

  • 02nd 5月 2026, ACCO Refrigeration test J line ( Admin).

    ACCO REFER

    Location: J-Line (Admin)

    System: VCU 28 & 29

    Test Pressure: Pneumatic 600

    Exclusion Zone: 8 feet

    Date: 5/2/26 – 5/3/26

    Time: 3:30 PM – 3:30 PM (24 Hours)

    Test Details
    ACCO Refer will be performing a pneumatic test on VCU systems 28 & 29 starting at 3:30PM 5/2/26 until 3:30 PM 5/3/26 (24-hours). Test pressure will be 600 PSI with an exclusion zone of 8 feet.

    Safety & Coordination:
    For the safety of all personnel and to minimize disruptions, please ensure that all trades coordinate with onsite teams to relocate work activities for the duration of the test. Please see delineation map for routes around the testing zone.

    添付ファイル :
    acco testing 5.2.26.png
現場天気予報
現在の現場の天気

利用できません


観察元 - 利用できません
タイムゾーン - アメリカ中部標準時
予測 - 土曜日, 9 5月

利用できません


タイムゾーン - アメリカ中部標準時
明日 - 日曜日, 10 5月

利用できません


重要な現場書類
現場に初めてですか?

この現場のPPE要件を知っていますか?

現場での初日に備えて、適切な安全装備を確保してください。

現場のPPE要件を表示

現場に到着したら、すぐに作業を開始できます。

ご都合の良い時にオンラインで現場登録を完了し、時間を節約してください。

登録を開始

現場に初めてですか?

この現場のPPE要件を知っていますか?

現場での初日に備えて、適切な安全装備を確保してください。

現場のPPE要件を表示

現場に初めてですか?

現場に到着したら、すぐに作業を開始できます。

ご都合の良い時にオンラインで現場登録を完了し、時間を節約してください。

登録を開始