03rd listopadu 2025, Stop work due to high winds
All roof work, outdoor elevated work, and crane activities must stop due to high wind speeds.
-
22nd října 2025, RNO4 VCU 39 pneumatic testing on 10/23/25
Safety team,
Please see below outlined bulletin for testing tomorrow and send to trades via bulletin.
Location: RNO4 admin area
System: Copper Refrigeration Lines
Pressure: 600 psi
Duration: 24 hours
Exclusion zone starts: 7:00 AM 10/23/25
Exclusion zone expected end: 8:00 AM 10/24/25
Acco Plumbing will be performing a pneumatic test in area 39, Test pressure is 600 psi for 24 hours hold time.
Please avoid these test area and barricades. Exclusion zones are barricaded and not to be crossed.
-
21st října 2025, Generator Maintenance
Generator for temp power will go down starting on the eastside first and then moving to the westside these shut down will only affect the building 30 minutes at a time.
FYI: This will happen every other week.
Aktuální počasí na pracovišti
Nedostupné
Časové pásmo - severoamerický centrální standardní čas
Předpověď – neděle, 14 prosince
Nedostupné
Zítra - pondělí, 15 prosince
Nedostupné
Znáte požadavky na OOPP pro toto pracoviště?
Ujistěte se, zda máte pro první den na pracovišti správné bezpečnostní vybavení.
Po příjezdu na místo můžete začít pracovat dříve.
Jakmile budete moci, dokončete registraci do pracoviště online, a ušetřete si tak čas.
Znáte požadavky na OOPP pro toto pracoviště?
Ujistěte se, zda máte pro první den na pracovišti správné bezpečnostní vybavení.
Po příjezdu na místo můžete začít pracovat dříve.
Jakmile budete moci, dokončete registraci do pracoviště online, a ušetřete si tak čas.