  • 03rd 十一月 2025, Stop work due to high winds

    All roof work, outdoor elevated work, and crane activities must stop due to high wind speeds.

  • 22nd 十月 2025, RNO4 VCU 39 pneumatic testing on 10/23/25

    Safety team,
    Please see below outlined bulletin for testing tomorrow and send to trades via bulletin.
    Location: RNO4 admin area
    System: Copper Refrigeration Lines
    Pressure: 600 psi
    Duration: 24 hours
    Exclusion zone starts: 7:00 AM 10/23/25
    Exclusion zone expected end: 8:00 AM 10/24/25
    Acco Plumbing will be performing a pneumatic test in area 39, Test pressure is 600 psi for 24 hours hold time.
    Please avoid these test area and barricades. Exclusion zones are barricaded and not to be crossed.

  • 21st 十月 2025, Generator Maintenance

    Generator for temp power will go down starting on the eastside first and then moving to the westside these shut down will only affect the building 30 minutes at a time.

    FYI: This will happen every other week.

现场天气预报
当前现场天气

不可用


观测信息来自 - 不可用
时区 - 北美东部标准时间
预测 - 星期日、14 十二月

不可用


时区 - 北美东部标准时间
明天 - 星期一, 15 十二月

不可用


重要现场文件
刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册

刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

刚到这个现场吗?

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册