KDP-Green Bean Cleaner (GBC)-Spartanburg - Site proiect public
-
05th mai 2026, RNO4 Building in TEST MODE
RNO4 Building is in TEST MODE, please be cautious with debris, dust, or smoke that can potentially activate the FIRE ALARM SYSTEM.
-
03rd mai 2026, Team, RNO4 Building is in TEST MODE please be cautious with debris, dust or smoke that can potentially activate the FIRE ALARM. Time: 6:30am to 2pm.
Team,
RNO4 Building is in TEST MODE please be cautious with debris, dust or smoke that can potentially activate the FIRE ALARM. Time: 6:30am to 2pm. -
02nd mai 2026, ACCO Refrigeration test J line ( Admin).
ACCO REFER
Anexe :
Location: J-Line (Admin)
System: VCU 28 & 29
Test Pressure: Pneumatic 600
Exclusion Zone: 8 feet
Date: 5/2/26 – 5/3/26
Time: 3:30 PM – 3:30 PM (24 Hours)
Test Details
ACCO Refer will be performing a pneumatic test on VCU systems 28 & 29 starting at 3:30PM 5/2/26 until 3:30 PM 5/3/26 (24-hours). Test pressure will be 600 PSI with an exclusion zone of 8 feet.
Safety & Coordination:
For the safety of all personnel and to minimize disruptions, please ensure that all trades coordinate with onsite teams to relocate work activities for the duration of the test. Please see delineation map for routes around the testing zone.
acco testing 5.2.26.png
Condiții meteo curente la șantier
Indisponibil
Fus orar - Ora standard orientală nord-americană
Prognoză - sâmbătă, 9 mai
Indisponibil
Mâine - duminică, 10 mai
Indisponibil
Cunoașteți cerințele EIP pentru acest șantier?
Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.
Începeți să lucrați mai devreme atunci când ajungeți în locație.
Finalizați înregistrarea la șantier online când doriți și economisiți timp.
Cunoașteți cerințele EIP pentru acest șantier?
Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.
Începeți să lucrați mai devreme atunci când ajungeți în locație.
Finalizați înregistrarea la șantier online când doriți și economisiți timp.