JAN fence Support - 公共プロジェクト現場
-
03rd 11月 2025, Stop work due to high winds
All roof work, outdoor elevated work, and crane activities must stop due to high wind speeds.
-
22nd 10月 2025, RNO4 VCU 39 pneumatic testing on 10/23/25
Safety team,
Please see below outlined bulletin for testing tomorrow and send to trades via bulletin.
Location: RNO4 admin area
System: Copper Refrigeration Lines
Pressure: 600 psi
Duration: 24 hours
Exclusion zone starts: 7:00 AM 10/23/25
Exclusion zone expected end: 8:00 AM 10/24/25
Acco Plumbing will be performing a pneumatic test in area 39, Test pressure is 600 psi for 24 hours hold time.
Please avoid these test area and barricades. Exclusion zones are barricaded and not to be crossed.
-
21st 10月 2025, Generator Maintenance
Generator for temp power will go down starting on the eastside first and then moving to the westside these shut down will only affect the building 30 minutes at a time.
FYI: This will happen every other week.
現在の現場の天気
最終更新日時: 18:05
温度: 16C
風速: 11KMH
最大風速: 14KMH @11:05
最低気温: 15C @6:05
最高気温: 19C @12:05
突風: 22KMH
最大突風: 46KMH @1:05
観察場所 - Mississippi, MS
タイムゾーン - アメリカ中部標準時
予測 - 水曜日, 11 2月
light rain
分: 14C マックス: 20C
予想降雨量: 0.1mm
予測場所 - Canton, MS
タイムゾーン - アメリカ中部標準時
明日 - 木曜日, 12 2月
overcast clouds
分: 12C マックス: 18C