IKO - Project Phoenix - Εργοτάξιο δημόσιου έργου
-
03rd Νοεμβρίου 2025, Stop work due to high winds
All roof work, outdoor elevated work, and crane activities must stop due to high wind speeds.
-
22nd Οκτωβρίου 2025, RNO4 VCU 39 pneumatic testing on 10/23/25
Safety team,
Please see below outlined bulletin for testing tomorrow and send to trades via bulletin.
Location: RNO4 admin area
System: Copper Refrigeration Lines
Pressure: 600 psi
Duration: 24 hours
Exclusion zone starts: 7:00 AM 10/23/25
Exclusion zone expected end: 8:00 AM 10/24/25
Acco Plumbing will be performing a pneumatic test in area 39, Test pressure is 600 psi for 24 hours hold time.
Please avoid these test area and barricades. Exclusion zones are barricaded and not to be crossed.
-
21st Οκτωβρίου 2025, Generator Maintenance
Generator for temp power will go down starting on the eastside first and then moving to the westside these shut down will only affect the building 30 minutes at a time.
FYI: This will happen every other week.
Ο καιρός στο τρέχων εργοτάξιο
Μη διαθέσιμο
Ζώνη ώρας - Ανατολική χειμερινή ώρα Βόρειας Αμερικής
Πρόγνωση - Κυριακή, 14 Δεκεμβρίου
Μη διαθέσιμο
Αύριο - Δευτέρα, 15 Δεκεμβρίου
Μη διαθέσιμο
Γνωρίζετε τις προδιαγραφές των ΜΑΠ για το συγκεκριμένο εργοτάξιο;
Βεβαιωθείτε ότι έχετε τον κατάλληλο εξοπλισμό ασφαλείας για την πρώτη ημέρα σας στο εργοτάξιο.
Προβολή ΜΑΠ (Μέσα Ατομικής Προστασίας) που Απαιτούνται στην Εργασία
Ξεκινήστε να εργάζεστε συντομότερα όταν φτάνετε στο εργοτάξιο.
Ολοκληρώστε την καταχώρηση του εργοταξίου σας διαδικτυακά, με την άνεσή σας και εξοικονομήστε χρόνο.
Γνωρίζετε τις προδιαγραφές των ΜΑΠ για το συγκεκριμένο εργοτάξιο;
Βεβαιωθείτε ότι έχετε τον κατάλληλο εξοπλισμό ασφαλείας για την πρώτη ημέρα σας στο εργοτάξιο.
Προβολή ΜΑΠ (Μέσα Ατομικής Προστασίας) που Απαιτούνται στην Εργασία
Ξεκινήστε να εργάζεστε συντομότερα όταν φτάνετε στο εργοτάξιο.
Ολοκληρώστε την καταχώρηση του εργοταξίου σας διαδικτυακά, με την άνεσή σας και εξοικονομήστε χρόνο.