15th septiembre 2025, SITE SHUT DOWN 4PM 9/17
ALL INTERIOR WORK WILL BE SHUT DOWN AT 4PM ON 9/17 FOR AIR TESTING ON THE FIRE STANDPIPE SYSTEM IN THE BUILDING. PLEASE PLAN ALL WORK ACCORDINGLY.
-
15th septiembre 2025, RNO4 Cloud 600 ROOF Piping Testing
Morning all,
This email is to notify all trade partners that there will be a test conducted today on the RNO4 Roof in cloud 600.
Location RNO4 cloud 6 ROOF
System: Chilled water
Pressure: 150 PSI
Duration: 2 hours
Start time: 9/15 1500
End Time: 9/15 1730
Questions? Have your FOREMAN contact Alex Pifer with Gray,
Appreciate your cooperation.
Thank you
-
05th septiembre 2025, Cosco RNO 5 Fire Suppression Testing
Pneumatic testing of RNO5 fire suppression systems over power rooms 605, 606, 607, 407, 406, 405, 507, 508, 509 at 40psi from 9/6 2pm- 9/9 10am. These room will not be accessible for the duration of testing.
Adjuntos :
Power room 4 5 6 .pdf
Aboveground Test Cert copy .pdf
IMG_0383.jpg
Switch5 system 5&6.pdf
System 14.pdf
Tiempo actual del emplazamiento
No disponible
Huso horario - hora estándar central
Pronóstico - miércoles, 8 octubre
No disponible
Mañana - jueves, 9 octubre
No disponible
¿Conoce los requisitos de EPI para este emplazamiento?
Asegúrese de que cuenta con el equipo de seguridad correcto para su primer día en el emplazamiento.
Empiece a trabajar antes al llegar "in situ".
Complete su registro en el sitio web en línea a su conveniencia y ahorre tiempo.
¿Conoce los requisitos de EPI para este emplazamiento?
Asegúrese de que cuenta con el equipo de seguridad correcto para su primer día en el emplazamiento.
Empiece a trabajar antes al llegar "in situ".
Complete su registro en el sitio web en línea a su conveniencia y ahorre tiempo.