Dari - Project Cream - सार्वजनिक प्रोजेक्ट साइट
-
03rd नवम्बर 2025, Stop work due to high winds
All roof work, outdoor elevated work, and crane activities must stop due to high wind speeds.
-
22nd अक्तूबर 2025, RNO4 VCU 39 pneumatic testing on 10/23/25
Safety team,
Please see below outlined bulletin for testing tomorrow and send to trades via bulletin.
Location: RNO4 admin area
System: Copper Refrigeration Lines
Pressure: 600 psi
Duration: 24 hours
Exclusion zone starts: 7:00 AM 10/23/25
Exclusion zone expected end: 8:00 AM 10/24/25
Acco Plumbing will be performing a pneumatic test in area 39, Test pressure is 600 psi for 24 hours hold time.
Please avoid these test area and barricades. Exclusion zones are barricaded and not to be crossed.
-
21st अक्तूबर 2025, Generator Maintenance
Generator for temp power will go down starting on the eastside first and then moving to the westside these shut down will only affect the building 30 minutes at a time.
FYI: This will happen every other week.
साइट का मौजूदा मौसम
उपलब्ध नहीं है
समय क्षेत्र - उत्तरी अमेरिकी केंद्रीय मानक समय
पूर्वानुमान - रविवार, 14 दिसम्बर
उपलब्ध नहीं है
कल - सोमवार, 15 दिसम्बर
उपलब्ध नहीं है
क्या आप इस साइट के लिए आवश्यक PPE के बारे में जानते हैं?
सुनिश्चित करें कि आपके पास साइट पर पहले दिन के लिए सही सुरक्षा इक्विपमेंट हैं।
जब आप साइट पर पहुंचें, तो जल्द से जल्द काम करना शुरू कर दें।
अपनी सुविधा के अनुसार अपना साइट रजिस्ट्रेशन ऑनलाइन पूरा करें और अपना समय बचाएँ।
क्या आप इस साइट के लिए आवश्यक PPE के बारे में जानते हैं?
सुनिश्चित करें कि आपके पास साइट पर पहले दिन के लिए सही सुरक्षा इक्विपमेंट हैं।
जब आप साइट पर पहुंचें, तो जल्द से जल्द काम करना शुरू कर दें।
अपनी सुविधा के अनुसार अपना साइट रजिस्ट्रेशन ऑनलाइन पूरा करें और अपना समय बचाएँ।