Project Cosmos
近期公告
  • 05th 五月 2026, RNO4 Building in TEST MODE

    RNO4 Building is in TEST MODE, please be cautious with debris, dust, or smoke that can potentially activate the FIRE ALARM SYSTEM.

  • 03rd 五月 2026, Team, RNO4 Building is in TEST MODE please be cautious with debris, dust or smoke that can potentially activate the FIRE ALARM. Time: 6:30am to 2pm.

    Team,

    RNO4 Building is in TEST MODE please be cautious with debris, dust or smoke that can potentially activate the FIRE ALARM. Time: 6:30am to 2pm.

  • 02nd 五月 2026, ACCO Refrigeration test J line ( Admin).

    ACCO REFER

    Location: J-Line (Admin)

    System: VCU 28 & 29

    Test Pressure: Pneumatic 600

    Exclusion Zone: 8 feet

    Date: 5/2/26 – 5/3/26

    Time: 3:30 PM – 3:30 PM (24 Hours)

    Test Details
    ACCO Refer will be performing a pneumatic test on VCU systems 28 & 29 starting at 3:30PM 5/2/26 until 3:30 PM 5/3/26 (24-hours). Test pressure will be 600 PSI with an exclusion zone of 8 feet.

    Safety & Coordination:
    For the safety of all personnel and to minimize disruptions, please ensure that all trades coordinate with onsite teams to relocate work activities for the duration of the test. Please see delineation map for routes around the testing zone.

    附件 :
    acco testing 5.2.26.png
现场天气预报
当前现场天气

天气不可用


观测信息来自 - Open Weather API
观测位置 - Carlsbad、CA
时区 - 北美太平洋标准时间
预测 - 星期六、9 五月

few clouds
最低: 15C 最大: 20C


预测信息来自 - Open Weather API
预测位置 - Carlsbad、CA
时区 - 北美太平洋标准时间
明天 - 星期日, 10 五月

few clouds
最低: 16C 最大: 21C


重要现场文件
刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册

刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

刚到这个现场吗?

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册