AWS PDX138 - Herkese Açık Proje Sahası
-
03rd Kasım 2025, Stop work due to high winds
All roof work, outdoor elevated work, and crane activities must stop due to high wind speeds.
-
22nd Ekim 2025, RNO4 VCU 39 pneumatic testing on 10/23/25
Safety team,
Please see below outlined bulletin for testing tomorrow and send to trades via bulletin.
Location: RNO4 admin area
System: Copper Refrigeration Lines
Pressure: 600 psi
Duration: 24 hours
Exclusion zone starts: 7:00 AM 10/23/25
Exclusion zone expected end: 8:00 AM 10/24/25
Acco Plumbing will be performing a pneumatic test in area 39, Test pressure is 600 psi for 24 hours hold time.
Please avoid these test area and barricades. Exclusion zones are barricaded and not to be crossed.
-
21st Ekim 2025, Generator Maintenance
Generator for temp power will go down starting on the eastside first and then moving to the westside these shut down will only affect the building 30 minutes at a time.
FYI: This will happen every other week.
Geçerli Saha Hava Durumu
Son Güncelleme Saati: 09:05
Sıcaklık: 2C
Rüzgar Hızı: 11KMH
Maks. Rüzgar: 11KMH @09:05
Min Sıcaklık: -1C @06:05
Maks Sıcaklık: 9C @09:05
Maks Bora: 4KMH
Gözlem Konumu - Hermiston, OR
Zaman Dilimi - Kuzey Amerika Pasifik Standart Saati
Tahmin - Pazar, 14 Aralık
sky is clear
Min: 8C Maks: 14C
Tahmin Konumu - Hermiston, OR
Zaman Dilimi - Kuzey Amerika Pasifik Standart Saati
Yarın - Pazartesi, 15 Aralık
light rain
Min: 11C Maks: 17C
Beklenen Yağmur: 0,4mm
Bu sahanın KKD Gereksinimlerini biliyor musunuz?
Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.
Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.
Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.
Bu sahanın KKD Gereksinimlerini biliyor musunuz?
Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.
Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.
Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.