Switch - RNO 4 - Public Project Site
-
25th April 2025, 48 hour MVG 01/04 Energization
All
This is a 48hr-energization notice informing everyone onsite at QTS NAL2 that we be energizing medium voltage gears 1 and 4 (MVG-01/04) in the Gen Yard on the west side of DC1 at 12pm on 04.28.25. The entire Gen yard and the substation will be a no work zone for all Unauthorized Personnel. Violation of any CAZ (controlled access zone) will result in immediate removal from the project. -
25th April 2025, 48 hour Energization notice
All
This is a 48hr-energization notice informing everyone onsite at QTS NAL2 that we be energizing medium voltage gears 1 and 4 (MVG-01/04) in the Gen Yard on the west side of DC1 at 12pm on 04.28.25. The entire Gen yard and the substation will be a no work zone for all Unauthorized Personnel. Violation of any CAZ (controlled access zone) will result in immediate removal from the project. -
15th April 2025, Switch - New Bus Route
Starting immediately as the buses leave the offsite location to the Switch gate.
New route leaving the offsite location, turn right on USA parkway, drive to Denmark Dr. and turn left on to Denmark Dr. and turn left on Peru Dr. and straight to Switch gate. The buses will have 2 sets of railroad crossings and will need to stop at each crossing. Same route when exiting the job site to return to the offsite location.
Current Site Weather
Unavailable
Time Zone - Mountain Standard Time
Forecast - Saturday, 26 April
Unavailable
Tomorrow - Sunday, 27 April
Unavailable
Do you know the PPE Requirements for this site?
Ensure you have the correct safety equipment for your first day at the site.
Get started working sooner when you arrive on site.
Enroll online at your convenience and save yourself time.
Do you know the PPE Requirements for this site?
Ensure you have the correct safety equipment for your first day at the site.
Get started working sooner when you arrive on site.
Enroll online at your convenience and save yourself time.