PER-729022
Ground Disturbance Permit
Keller North America, Inc
Larry Kleino
Body Shop - Area P / Entire area P
08:00
15:00
Prévu
il y a 11 minutes
PER-729023
Ground Disturbance Permit
Keller North America, Inc
Larry Kleino
Body Shop - Area S / Entire area S
08:00
15:00
Prévu
il y a 11 minutes
PER-729386
Request to Energize/De-energize
AMCON Industrial
Carl Tyre
+ 4 autres superviseurs
Assembly - Area D / Assembly PH.1 South
Assembly - Area E / Assembly PH.1 South
06:45
16:30
Prévu
il y une heure
PER-726448
Request to Energize/De-energize
Edwards Electric Service, LLC
Angel Nieves Rivera
+ 6 autres superviseurs
Assembly - Area E / BUILDING 30 (ASSEMBLY), BUILDING 30 EXPANSION PHASE 1 - E SIDE
05:00
16:30
En progression
PER-729498
Ground Disturbance Permit
Landmark Construction
Aaron Bradley
+ 11 autres superviseurs
Body Shop - Area A / Body shop phase 1 & 2
Body Shop - Area Z / Body shop phase 1 & 2
07:37
17:30
Prévu
il y a 34 minutes
Structure Penetration Permit
Mullins Mechanical
Connor Stephens
+ 8 autres superviseurs
Assembly - Area E / Assembly area E
10:00
30/10/2026
30/10/2026
17:04
30/10/2026
30/10/2026
Terminé
il y a 18 heures
Ground Disturbance Permit
Landmark Construction
Aaron Bradley
+ 11 autres superviseurs
Assembly - Area D / Loading dock building 30 area D
06:55
30/10/2026
30/10/2026
17:30
30/10/2026
30/10/2026
Terminé
il y a 12 heures
Request to Energize/De-energize
Bachner Electro USA Inc
Anthony Wurthmann
+ 1 autre superviseur
Assembly - Area E / BUILDING 30 (ASSEMBLY), BUILDING 30 EXPANSION PHASE 1 - E SIDE
07:50
30/10/2026
30/10/2026
17:30
30/10/2026
30/10/2026
Terminé
il y a 14 heures
Request to Energize/De-energize
Bachner Electro USA Inc
Anthony Wurthmann
+ 1 autre superviseur
Assembly - Area D / BUILDING 30 (ASSEMBLY), BUILDING 30 EXPANSION PHASE 1 - SOUTH D
07:52
30/10/2026
30/10/2026
17:30
30/10/2026
30/10/2026
Terminé
il y a 14 heures